Openreach ACCN : OR 075 |
|
|
|
|
|
|
|
New |
|
|
|
|
|
|
|
|
Effective Date |
30-Jun-08 |
|
|
|
|
|
|
|
Notification Date |
01-Apr-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OPENREACH
ACCESS CHARGE CHANGE NOTICE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACCN NUMBER: |
|
OR 075 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PRODUCT: |
|
Sub Loop
Unbundling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EFFECTIVE DATE: |
|
30-Jun-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUBMITTED TO OFCOM ON: |
01-Apr-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price List |
|
|
|
|
|
|
|
Section : |
Local Loop Unbundling |
|
|
|
|
|
|
|
Product : |
Sub Loop Unbundling |
|
|
|
|
|
|
|
Page : |
|
|
|
|
|
|
|
|
Reference : |
2.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Forecasts and Surveys |
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
£ Exc
VAT |
|
|
|
|
Data
Report per MDF site - (Note 1) |
01/03/2008 |
|
101.04 |
|
|
|
|
Full survey |
01/03/2008 |
|
350.00 |
|
|
|
|
Full Survey
non-attendance |
01/03/2008 |
|
85.00 |
|
|
|
|
Survey Cancellation (prior to meeting, post
meeting full price applies) – (Note 2) |
01/03/2008 |
|
75.00 |
|
|
|
|
|
|
|
|
|
Provision and Rental
Charges |
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
£ Exc
VAT |
|
|
|
|
Sub Loop Connection charge – (MPF Transfer) |
30/06/2005 |
29/06/2008 |
99.09 |
|
|
|
|
30/06/2008 |
|
127.61 |
|
|
|
|
Sub Loop MPF Connection charge – New Provide –
Standard (Note 4) |
30/06/2005 |
29/06/2008 |
151.97 |
|
|
|
|
30/06/2008 |
|
106.62 |
|
|
|
|
Sub Loop - Shared MPF Connection |
30/06/2005 |
29/06/2008 |
99.09 |
|
|
|
|
30/06/2008 |
|
127.61 |
|
|
|
|
Sub Loop MPF Rental per annum |
30/06/2005 |
|
93.96 |
|
|
|
|
Sub Loop Shared MPF Rental per annum |
30/06/2005 |
|
11.47 |
|
|
|
|
Sub Loop – MPF
New Line Minor Network Intervention |
30/06/2005 |
29/06/2008 |
299.35 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
Sub Loop – MPF
New Line Major Network Intervention |
30/06/2005 |
29/06/2008 |
626.95 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
Sub Loop – MPF New Line
Small Network Build |
30/06/2005 |
29/06/2008 |
2759.86 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
Sub Loop Hand-back charge – Transfer |
31/12/2000 |
29/06/2008 |
29.00 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Test, Cease, Amend, Cancel and Rejection Charges |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sub Loop Cease charge |
31/12/2000 |
29/06/2008 |
29.00 |
|
|
|
|
30/06/2008 |
|
100.67 |
|
|
|
|
PCP Extension Upgrade (Note 3) |
01/03/2008 |
|
1829.11 |
|
|
|
|
Shared MPF/MPF Enhanced Care per annum |
30/06/2008 |
|
37.54 |
|
|
|
|
Shared MPF/MPF Re-termination tie pair – next
available Field Appt |
30/06/2008 |
|
100.67 |
|
|
|
|
Shared MPF /MPF
Order rejected at initial validation |
30/06/2008 |
|
7.14 |
|
|
|
|
Shared MPF/MPF Order rejected at detailed
evaluation |
30/06/2008 |
|
14.28 |
|
|
|
|
Cancellation
of Shared MPF/MPF Order |
30/06/2008 |
|
7.14 |
|
|
|
|
Allowable
change to Shared MPF/MPF Order |
30/06/2008 |
|
7.14 |
|
|
|
|
Sub loop standard line test - RWT |
30/06/2005 |
29/06/2008 |
99.09 |
|
|
|
|
From 30/06/08 this will be charged for via Time
Related charges (See Note5) |
30/06/2008 |
|
|
|
|
|
|
Sub loop resistance test |
30/06/2005 |
29/06/2008 |
99.09 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
Sub loop insertion loss |
30/06/2005 |
29/06/2008 |
99.09 |
|
|
|
|
30/06/2008 |
Withdrawn |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LLU Sub Loop Tie Cables |
|
|
|
|
|
|
|
|
|
Sub Loop Access Tie Cables (100 metre of length
only) |
Operative
Date |
Until |
Charge |
|
|
|
|
£ Exc
VAT |
|
|
|
|
Sub Loop Access Tie Cable Connection 20 pair (Note 6) |
01/03/2008 |
|
725.60 |
|
|
|
|
Sub Loop Access Tie Cable Connection 50 pair (Note 6) |
01/03/2008 |
|
725.60 |
|
|
|
|
Sub Loop Access Tie Cable Connection 100 pair (Note 6) |
01/03/2008 |
|
765.32 |
|
|
|
|
Sub Loop Access Tie Cable Rental per annum 20 pair (Note 6) |
01/03/2008 |
|
27.23 |
|
|
|
|
Sub Loop Access Tie Cable Rental per annum 50 pair (Note 6) |
01/03/2008 |
|
32.68 |
|
|
|
|
Sub Loop Access Tie Cable Rental per annum 100
pair (Note 6) |
01/03/2008 |
|
42.14 |
|
|
|
|
|
|
|
|
|
LLU Sub Loop Tie Cable – early cancellation fee |
|
|
|
|
|
|
|
|
|
An early cancellation fee applies to all SLU Access Tie Cables.
The table below explains the relevant fee payable to Openreach for the year
in which the SLU Access Tie Cable is cancelled. |
|
|
|
|
|
|
|
|
|
Year |
1st |
2nd |
3rd |
4th |
5th |
6th |
7th |
|
|
|
|
Fee (£) |
7 x annual |
6.5 x annual |
6 x annual |
5.5 x annual |
5 x annual |
4.5 x annual |
4 x annual |
|
|
|
|
rental |
rental |
rental |
rental |
rental |
rental |
rental |
|
|
|
|
|
|
|
|
|
Year |
8th |
9th |
10th |
11th |
12th |
13th |
14th |
|
|
|
|
Fee (£) |
3.5 x annual |
3 x annual |
2.5 x annual |
2 x annual |
1.5 x annual |
1 x annual |
0.5 x annual |
|
|
|
|
rental |
rental |
rental |
rental |
rental |
rental |
rental |
|
|
|
|
|
|
|
|
|
NOTES: |
|
|
|
|
|
|
|
|
|
1) Data reports will be charged on a per MDF site basis. |
|
|
|
|
|
|
|
|
|
2)
Orders placed and cancelled before completing a Full Survey will incurr a
cancellation charge, on completion of a Full Survey the survey charge will
always apply. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3) Charges for Sub-Loop PCP Extension Works will apply
whenever a Full Survey identifies existing space is exhausted. The price will
cover the replacement of the cabinet fabric only. Additional work, if
required to facilitate the fabric change or to enable the installation of Sub
Loop tie cables will be charged on a bespoke basis. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4) Additional charges may be raised
where non standard work is required:. |
|
|
|
|
|
|
|
|
|
For work done by Openreach engineers not
included in standard prices see `Time Related Charges' in the Common
Portfolio Products section of the price list for details. |
|
|
|
|
|
|
|
|
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do |
|
|
|
|
|
|
|
|
|
Where a Communication Provider has agreed
an appointment with BT for work at the End Users' site in connection with the
Communication Provider service, if BT is unable to carry out the work at, or
gain access to, such End User site or the appointment is broken (unless due
to BT's error). BT reserves the right to raise a Visit Charge as detailed in
Common Portfolio Products Section of this Price List. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do |
|
|
|
|
|
|
|
|
|
Charges for network infrastructure over and
above standard requirements are charged as excess construction and can be
found in `Excess Construction Charges' in the Common Portfolio Products
section of this Price List at : |
|
|
|
|
|
|
|
|
|
|
|
|
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do |
|
|
|
|
|
|
|
|
|
These
charges include work on internal trunking & traywork; breaking through
walls; additional poles, ducts and cables; radio charges and miscellaneous
non-standard or specially requested items. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) If a Communication Provider reports a fault and requests
a field visit to complete further diagnostic tests over |
|
|
|
|
and
above a standard line test (when available) and the fault diagnosis proves it
to be the responsibility of the |
|
|
|
|
Communication
Provider's (equipment), visit charges or TRC will be applied, which can be
found under |
|
|
|
|
Service Products:- |
|
|
|
|
|
|
|
|
|
|
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
British Telecommunications plc |
|
|
|
|
|
|
Registered office: |
|
|
|
|
|
|
81 Newgate Street |
|
|
|
|
|
|
London EC1A 7AJ |
|
|
|
|
|
|
Registered in England and Wales No. 1800000 |
|
|
|
|
Date: 1st April 2008 |
|
www.openreach.co.uk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|