Openreach ACCN : OR 083 | ![]() |
|||||||||
Change | ||||||||||
Effective Date | 31-Aug-08 | |||||||||
Notification Date | 02-Jun-08 | |||||||||
OPENREACH ACCESS CHARGE CHANGE NOTICE | ||||||||||
ACCN NUMBER: | OR 083 | |||||||||
PRODUCT: | LLU - MPF and SMPF Changes and Withdrawals | |||||||||
Ethernet - LLU Backhaul Private Circuits Product Withdrawal | ||||||||||
EFFECTIVE DATE: | 31-Aug-08 | |||||||||
SUBMITTED TO OFCOM ON: | 02-Jun-08 | |||||||||
Price List | ![]() |
|||||||||
Section : | Local Loop Unbundling | |||||||||
Product : | Metal Path Facility | |||||||||
Page : | ||||||||||
Reference : | 2.2 | |||||||||
Provision and Rental Charges | ||||||||||
For Additional Charges of Non - Standard Work (See Note 16) | ||||||||||
For details of MPF products and features refer to the MPF/SMPF Product Manual and End to End Process Manual available on the LLU web site. | ||||||||||
Operative Date | Until | Charge | ||||||||
£ Exc VAT | ||||||||||
MPF Connection charge – New Provide – Standard (note 16 and note 17) | 15/12/2005 | 99.95 | ||||||||
MPF line characteristics check on tactical platform (ECO) provision | 17/01/2002 | 30/08/2008 | 2.60 | |||||||
31/08/2008 | Withdrawn | |||||||||
Assurance Charges | ||||||||||
For details of MPF Assurance procedures please refer to the LLU Service Assurance Manual available on the LLU web site. | ||||||||||
Operative Date | Until | Charge | ||||||||
£ Exc VAT | ||||||||||
Level 1 Category Check | 01/04/2002 | 30/08/2008 | 103.00 | |||||||
31/08/2008 | Withdrawn | |||||||||
Level 2 Category Check | 01/04/2002 | 30/08/2008 | 94.00 | |||||||
31/08/2008 | Withdrawn | |||||||||
17) Multiple MPF new provisions enhanced capability. This is included within the provision process as described in the product documentation from the 30th June 2008. | ||||||||||
Price List | ![]() |
|||||||||
Section : | Local Loop Unbundling | |||||||||
Product : | Shared Metal Path Facility | |||||||||
Page : | ||||||||||
Reference : | 2.3 | |||||||||
Provision and Rental Charges | ||||||||||
For Additional Charges of Non - Standard Work (See Note 15) | ||||||||||
For details of SMPF products and features refer to the MPF/SMPF Product Manual and End to End Process Manual available on the LLU web site. | ||||||||||
Operative Date | Until | Charge | ||||||||
£ Exc VAT | ||||||||||
Shared MPF line characteristics provision | 17/01/2002 | 30/08/2008 | £2.60 | |||||||
31/08/2008 | Withdrawn | |||||||||
Price List | ![]() |
|||||||||
Section : | Ethernet | |||||||||
Product : | Backhaul Private Circuits | |||||||||
Page : | ||||||||||
Reference : | 3.13 | |||||||||
PRODUCT PAGE AND CONTENTS WITHDRAWN WITH AN EFFECTIVE OPERATIVE DATE 31st August 2008. | ||||||||||
For terms and conditions applicable to these charges payable to BT see the Standard LLU Backhaul Agreement. | ||||||||||
LLU Backhaul Private Circuit Handover | ||||||||||
LLU Backhaul Private Circuit Configuration SMA-16 | ||||||||||
Operative date | Until | Connection (fixed) (£ Ex VAT) | Annual Rental (Note 7) (£ Ex VAT) | |||||||
SMA-16 ADM with no trib interfaces (single fibre working) - existing site | 11.01.2006 | 30/08/2008 | 183,719.00 | 2,499.00 | ||||||
SMA-16 ADM with no trib interfaces (dual fibre working 1300nm) - existing site | 11.01.2006 | 30/08/2008 | 187,852.00 | 2,423.00 | ||||||
SMA-16 ADM with no trib interfaces (dual fibre working 1550nm) - existing site | 11.01.2006 | 30/08/2008 | 198,454.00 | 2,575.00 | ||||||
Additional charge for new site (Note 1) | 11.01.2006 | 30/08/2008 | 8,665.00 | 0.00 | ||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | 14.00 | ||||||
STM-1 electrical trib interface (2 ports) | 11.01.2006 | 30/08/2008 | 5,935.00 | 85.00 | ||||||
STM-1 optical (1300nm) trib interface (1 port) | 11.01.2006 | 30/08/2008 | 8,117.00 | 116.00 | ||||||
STM-1 electrical trib card (2 ports), required for 1+1 card protection | 11.01.2006 | 30/08/2008 | 2,967.00 | 43.00 | ||||||
STM-1 optical (1300nm) trib card (1 port), required for MSP protection | 11.01.2006 | 30/08/2008 | 2,182.00 | 31.00 | ||||||
STM-4 optical (1300nm) trib interface (1 port) | 11.01.2006 | 30/08/2008 | 18,653.00 | 267.00 | ||||||
STM-4 optical (1300nm) trib card (1 port), required for MSP protection | 11.01.2006 | 30/08/2008 | 6,784.00 | 97.00 | ||||||
LLU Backhaul Private Circuit Configuration SMA-4 | ||||||||||
Operative date | Until | Connection (fixed) (£ Ex VAT) | Annual Rental (Note 7) (£ Ex VAT) | |||||||
SMA-4 ADM with no trib interfaces (single fibre working) – existing site | 11.01.2006 | 30/08/2008 | 116,030.00 | 1,528.00 | ||||||
SMA-4 ADM with no trib interfaces (dual fibre working 1300nm) – existing site | 11.01.2006 | 30/08/2008 | 116,933.00 | 1,406.00 | ||||||
SMA-4 ADM with no trib interfaces (dual fibre working 1550nm) – existing site | 11.01.2006 | 30/08/2008 | 133,994.00 | 1,651.00 | ||||||
Additional charge for new site (Note 1) | 11.01.2006 | 30/08/2008 | 8,665.00 | 0.00 | ||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | 14.00 | ||||||
STM-1 electrical trib interface (1 ports) | 11.01.2006 | 30/08/2008 | 1,527.00 | 22.00 | ||||||
STM-1 optical (1300nm) trib interface (1 port) | 11.01.2006 | 30/08/2008 | 4,746.00 | 68.00 | ||||||
STM-1 electrical trib card (1 ports), required for 1+1 card protection | 11.01.2006 | 30/08/2008 | 1,282.00 | 18.00 | ||||||
STM-1 optical (1300nm) trib card (1 port), required for MSP protection | 11.01.2006 | 30/08/2008 | 2,182.00 | 31.00 | ||||||
STM-4 optical (1300nm) trib interface (1 port) | 11.01.2006 | 30/08/2008 | 17,040.00 | 244.00 | ||||||
STM-4 optical (1300nm) trib card (1 port), required for MSP protection | 11.01.2006 | 30/08/2008 | 6,784.00 | 97.00 | ||||||
LLU Backhaul Private Circuit Configuration MSH51 | ||||||||||
Operative date | Until | Connection (fixed) (£ Ex VAT) | Annual Rental (Note 7) (£ Ex VAT) | |||||||
MSH51 ADM with no trib interfaces (single fibre working) - existing site | 11.01.2006 | 30/08/2008 | 104,873.00 | 1,368.00 | ||||||
MSH51 ADM with no trib interfaces (dual fibre working 1300nm) - existing site | 11.01.2006 | 30/08/2008 | 113,016.00 | 1,350.00 | ||||||
MSH51 ADM with no trib interfaces (dual fibre working 1550nm) - existing site | 11.01.2006 | 30/08/2008 | 115,598.00 | 1,387.00 | ||||||
Additional charge for new site (Note 1) | 11.01.2006 | 30/08/2008 | 8,665.00 | 0.00 | ||||||
Per km from serving exchange to MSH node - single fibre working | 11.01.2006 | 30/08/2008 | 6,146.00 | 2.00 | ||||||
Per km from serving exchange to MSH node - dual fibre workings | 11.01.2006 | 30/08/2008 | 12,291.00 | 4.00 | ||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | 14.00 | ||||||
STM-1 electrical trib interface (4 ports) | 11.01.2006 | 30/08/2008 | 6,421.00 | 92.00 | ||||||
STM-1 optical (1300nm) trib interface (2 ports | 11.01.2006 | 30/08/2008 | 7,142.00 | 102.00 | ||||||
STM-1 electrical trib card (4 ports), required for 1+1 card protection | 11.01.2006 | 30/08/2008 | 2,140.00 | 31.00 | ||||||
STM-1 optical (1300nm) trib card (2 ports), required for MSP protection | 11.01.2006 | 30/08/2008 | 2,861.00 | 41.00 | ||||||
STM-4 optical (1300nm) trib interface (1 port) | 11.01.2006 | 30/08/2008 | 6,573.00 | 94.00 | ||||||
STM-4 optical (1300nm) Trib card (1 port), required for MSP protection | 11.01.2006 | 30/08/2008 | 2,292.00 | 33.00 | ||||||
Spread connection charge options (Note 2) | ||||||||||
Operative date | Until | Annual payment as percentage of connection charge | ||||||||
Spread over two years | 11.01.2006 | 30/08/2008 | 59.12% | |||||||
Spread over four years | 11.01.2006 | 30/08/2008 | 36.29% | |||||||
Connection of a New Circuit – per circuit | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
2 Mbit/s | 11.01.2006 | 30/08/2008 | 1,562.00 | |||||||
34 Mbit/s – 45 Mbit/s | 11.01.2006 | 30/08/2008 | 1,640.00 | |||||||
140 Mbit/s and above | 11.01.2006 | 30/08/2008 | 1,718.00 | |||||||
Co-Location Site Infrastructure | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
2Mbit/s circuit delivered by HDSL on existing copper | 11.01.2006 | 30/08/2008 | 3,937.00 | |||||||
2Mbit/s circuit delivered by HDSL on new copper (note 11) | 11.01.2006 | 30/08/2008 | 4,801.00 | |||||||
Provide a 2Mbit 4x2 at new fibre site | 11.01.2006 | 30/08/2008 | 9,816.00 | |||||||
Provide a 2Mbit 4x2 at existing fibre site | 11.01.2006 | 30/08/2008 | 4,457.00 | |||||||
Provide a 2Mbit 16x2 at new fibre site | 11.01.2006 | 30/08/2008 | 15,296.00 | |||||||
Provide a 2Mbit 16x2 at existing fibre site | 11.01.2006 | 30/08/2008 | 9,937.00 | |||||||
Subsequent 2Mbit/s circuit on existing LLU Backhaul 4x2 or 16x2 (provided after 1/8/01) | 11.01.2006 | 30/08/2008 | No infrastructure charge | |||||||
LLU co-location sited SMA-1 ADM | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
SMA-1 ADM with no trib interfaces (single fibre working) – new site | 11.01.2006 | 30/08/2008 | 38,377.00 | |||||||
SMA-1 ADM with no trib interfaces (single fibre working) – new site | 11.01.2006 | 30/08/2008 | 33,018.00 | |||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | |||||||
2Mbit/s trib card (16 ports) | 11.01.2006 | 30/08/2008 | 3,915.00 | |||||||
34Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
45Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
STM-1 electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 1,282.00 | |||||||
STM-1 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 2,182.00 | |||||||
140Mbit/s electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 1,967.00 | |||||||
LLU co-location sited SMA-4 ADM | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
SMA-4 ADM with no trib interfaces (single fibre working) – new site | 11.01.2006 | 30/08/2008 | 104,276.00 | |||||||
SMA-4 ADM with no trib interfaces (single fibre working) – existing site | 11.01.2006 | 30/08/2008 | 98,917.00 | |||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | |||||||
2Mbit/s trib cards (32 ports) | 11.01.2006 | 30/08/2008 | 7,003.00 | |||||||
34Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
45Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
STM-1 electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 1,282.00 | |||||||
STM-1 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 2,182.00 | |||||||
140Mbit/s electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 1,967.00 | |||||||
STM-4 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 6,784.00 | |||||||
LLU co-location sited SMA-16 ADM | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
SMA-16 with no trib interfaces (single fibre working) – new site | 11.01.2006 | 30/08/2008 | 171,224.00 | |||||||
SMA-16 with no trib interfaces (single fibre working) – existing site | 11.01.2006 | 30/08/2008 | 165,865.00 | |||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | |||||||
2Mbit/s trib cards (32 ports) | 11.01.2006 | 30/08/2008 | 7,003.00 | |||||||
34Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
45Mbit/s trib card (3 ports) | 11.01.2006 | 30/08/2008 | 2,077.00 | |||||||
STM-1 electrical trib card (2 ports) | 11.01.2006 | 30/08/2008 | 165,865.00 | |||||||
STM-1 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 2,182.00 | |||||||
140Mbit/s electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 1,967.00 | |||||||
STM-4 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 6,784.00 | |||||||
LLU co-location sited MSH-51C ADM | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
MSH51 with no trib interfaces (single fibre working) – new site | 11.01.2006 | 30/08/2008 | 114,602.00 | |||||||
MSH51 with no trib interfaces (single fibre working) – existing site | 11.01.2006 | 30/08/2008 | 109,243.00 | |||||||
MSH51 with no trib interfaces (dual fibre working 1300nm) – new site | 11.01.2006 | 30/08/2008 | 112,088.00 | |||||||
MSH51 with no trib interfaces (dual fibre working 1300nm) – existing site | 11.01.2006 | 30/08/2008 | 101,370.00 | |||||||
MSH51 with no trib interfaces (dual fibre working 1550nm) – new site | 11.01.2006 | 30/08/2008 | 129,149.00 | |||||||
MSH51 with no trib interfaces (dual fibre working 1550nm) - existing site | 11.01.2006 | 30/08/2008 | 118,431.00 | |||||||
Per km from serving exchange to MSH node - single fibre working | 11.01.2006 | 30/08/2008 | 6,146.00 | |||||||
Per km from serving exchange to MSH node - dual fibre working | 11.01.2006 | 30/08/2008 | 12,291.00 | |||||||
Standby batteries if required | 11.01.2006 | 30/08/2008 | 973.00 | |||||||
STM-1 electrical trib card (4 ports) | 11.01.2006 | 30/08/2008 | 2,140.00 | |||||||
STM-1 optical (1300nm) trib card (2 ports) | 11.01.2006 | 30/08/2008 | 2,182.00 | |||||||
140Mbit/s electrical trib card (1 port) | 11.01.2006 | 30/08/2008 | 2,140.00 | |||||||
STM-4 optical (1300nm) trib card (1 port) | 11.01.2006 | 30/08/2008 | 6,784.00 | |||||||
Circuit Rental / Maintenance | ||||||||||
Circuit rental per annum (Note 7) | Regular Care | Enhanced Care | ||||||||
Bandwidth | Operative Date | Until | LLU Co-location site fixed (£ per annum) | Main link fixed (£ per annum) | Main link (£ per km p.a. up to break point) | Charge break point (km) | Charge beyond break point (£ per km p.a.) | Fixed (£ p.a) | Per km (£p.a.) | |
2M | 11.01.06 | 30/08/2008 | 533 | 779 | 59.7 | 15 | 107.34 | 328 | 2.98 | |
34/45M | 11.01.06 | 30/08/2008 | 3,771 | 3,828 | 628.59 | 15 | 583.68 | 1,900 | 31.43 | |
140/155M | 11.01.06 | 30/08/2008 | 10,577 | 14,659 | 2,200.23 | 15 | 1,236.57 | 6,309 | 110.01 | |
Bandwidth (Note 8) |
Operative Date | Until | LLU Co-location site fixed charge per annum (£) | Single fibre working (£) | Dual fibre working (£) | Rental
charge per annum per network hop across MSH (note 7) (£) |
||||
622M | 11.01.2006 | 30/08/2008 | 1,319 | 2 | 4 | 75,000 | ||||
Other Charges | ||||||||||
Time Related Charges | ||||||||||
Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) are detailed in the Common Portfolio Products section of the price list, Section 4.2 that can be found at: | ||||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||||
Excess Construction Charges | ||||||||||
Excess Construction Charges are detailed in the Common Portfolio Products section of the price list, Section 4.3 that can be found at | ||||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||||
Shift of a circuit an LLU Co-Location site (2 Mbit/s only) | ||||||||||
Operative date | Until | Single charge (£ Ex VAT) | ||||||||
Shift charge per circuit - 2 Mbit/s | 11.01.2006 | 30/08/2008 | £1,562 | |||||||
Shift of a Circuit at LLU Backhaul Circuit point of handover ( Note 10) | ||||||||||
Operative date | Until | Mon - Sat (Note 9) | Sundays | Single charge (£) | ||||||
Shift charge per circuit - 2 Mbit/s | 11.01.2006 | 28/08/2008 | £91 | £121 | £152 | |||||
Cancellation Charges - (Note 5) | ||||||||||
Cancellation charges for Circuits Normally Provided in 10 Working Days | ||||||||||
Working days before Contractual Completion Date | % of Connection Charge | |||||||||
1 or less | 90 | |||||||||
2 > 3 | 75 | |||||||||
4 > 5 | 60 | |||||||||
6 > 8 | 30 | |||||||||
9 or more | 0 | |||||||||
Cancellation Charges for Circuits Normally Provided in 30 Working Days or with CCD's agreed with the Communications Provider | ||||||||||
Working days before Contractual Completion Date | % of Connection Charge | |||||||||
2 or less | 90 | |||||||||
2 > 3 | 75 | |||||||||
20 - 22 | 60 | |||||||||
23 - 25 | 30 | |||||||||
26 or more | 0 | |||||||||
Cancellation charges for LLU Backhaul Private Circuit handover and Co-Location Link Infrastructure provision | ||||||||||
Working days before Contractual Delivery Date (Note 6) | % of Connection Charge | |||||||||
2 or less | 90 | |||||||||
2 > 3 | 75 | |||||||||
20 - 22 | 60 | |||||||||
23 - 25 | 30 | |||||||||
26 or more | 0 | |||||||||
Notes: | ||||||||||
1) To obtain the total New Site connection charge, this additional charge must be added to the relevant 'Existing Site' connection charge. The price covers the installation of duct from the CP’s POH, to their nearest serving exchange. | ||||||||||
2) Available on charge for new SMA4, SMA16 or MSH51 POH only – payments due quarterly in advance in addition to rental. If a customer cancels during a period or defaults on the payment of the infrastructure spread connection charge, the outstanding balance shall become payable. | ||||||||||
3) Where duct or external plant is provided for the sole use of a CP or a CP’s customer, excess construction charges will apply if it is not envisaged that any other CP will make use of it within 12 months of completion of the first circuit on it.. There is no ‘within tariff’ allowance - the full value of any applicable charge is payable. | ||||||||||
5) All days will be calculated as Working Days, i.e. ignoring weekends and public holidays. The cancellation date must be given in writing by the CP. Cancellation charges will be raised only if a signed contract has been received from the Operator. If BT fails to meet the contractual delivery date and the customer cancels the order, a charge will not be raised. The full cost of any additional work, e.g. duct, that is separately identified on the contract and which has been specifically incurred for the order by the time of the cancellation, will be recovered in addition to the cancellation charge. Should an Operator request amendments to the contractual delivery date and subsequently cancel the order, the cancellation charge will be calculated on the days between the date that the Operator notified BT of the first amendment and the original contractual delivery date. | ||||||||||
6) Commencement of rental is as follows: for LLU Backhaul Private Circuit handover links the Ready for Service Date; for LLU Backhaul Co-location site links the Contractual Completion Date | ||||||||||
7) Quarterly billing of this item is available. | ||||||||||
8) The 622Mbit/s product includes the Enhanced Care maintenance option within tariff. | ||||||||||
9) Charge covers out-of-hours working. | ||||||||||
10) This charge is only applicable where all infrastructure exists at the new terminating point and where the existing and receiving ADM are delivered over SDH equipment. | ||||||||||
11) New Copper is where both a new BT termination point and new cable are to LLU co-location space are required. Excess Construction charges may apply. | ||||||||||
British Telecommunications plc | ||||||||||
Registered office: | ||||||||||
81 Newgate Street | ||||||||||
London EC1A 7AJ | ||||||||||
Registered in England and Wales No. 1800000 | ||||||||||
Date: 02 June 2008 | www.openreach.co.uk |