Openreach ACCN : OR 084 | ![]() |
|||||||
New | ||||||||
Effective Date | 01-Jul-08 | |||||||
Notification Date | 20-May-08 | |||||||
OPENREACH ACCESS CHARGE CHANGE NOTICE | ||||||||
ACCN NUMBER: | OR 084 | |||||||
PRODUCT: | Ethernet Backhaul Direct and Bulk Transport Link Migration | |||||||
EFFECTIVE DATE: | 01-Jul-08 | |||||||
SUBMITTED TO OFCOM ON: | 20-May-08 | |||||||
Price List | ![]() |
|||||||
Section : | Connectivity Services | |||||||
Product : | Ethernet Backhaul Direct | |||||||
Page : | ||||||||
Reference : | 3.2.1 | |||||||
Ethernet Backhaul Direct Connection and Rental Charges | ||||||||
Prices per circuit | Operative Date | Until | Connection | Annual Rental Band A | Annual Rental Band B | Annual Rental Band C | ||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | (£) Ex VAT | |||||
(Note 1& 2) | (Note 3) | (Note 3) | (Note 3) | |||||
1Gbps | 22/05/2008 | £4,575.00 | £7,782.00 | £9,227.00 | £13,450.00 | |||
Migration Charges from BES to EBD | ||||||||
(note 10) | Operative Date | Until | Migration Charge | Annual Rental Band A | Annual Rental Band B | Annual Rental Band C | ||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | (£) Ex VAT | |||||
BES to EBD Migration Charge | 01/07/2008 | £2,287.50 | £7,782.00 | £9,227.00 | £13,450.00 | |||
Ethernet Backhaul Direct Resilience Option 2 (Notes 8 & 9 ) | ||||||||
Prices per circuit | Operative Date | Until | Connection | Annual Rental Band A | Annual Rental Band B | Annual Rental Band C | ||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | (£) Ex VAT | |||||
(Note 1 & 3) | (Note 4) | (Note 4) | (Note 4) | |||||
1Gbps | 22/05/2008 | £4,575.00 | £7,782.00 | £9,227.00 | £13,450.00 | |||
Generic Facility Fee | 22/05/2008 | n/a | £800.00 | £800.00 | £800.00 | |||
5) All services include the care level set out in the Service Level Agreement within tariff | ||||||||
6) For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list, that can be found at: | ||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||
7) Excess Construction Charges will be raised in addition to normal Connection charges where additional infrastructure is provided to give new or extended service at a Site / Communications Provider's Site (where a BTL facilitates this) or other requested location where BT would otherwise not choose to extend its network on the basis of normal commercial criteria. Excess charges apply to situations including provision to a new location within the Site / Communications Provider's Site (where a BTL facilitates this) but does not apply to situations where existing capacity needs to be increased. There is no ‘within tariff’ allowance - the full value of any applicable charge is payable. Excess Construction Charges are detailed in the Service Products section of the price list that can be found at: | ||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||
8) For Ethernet Backhaul Direct, Resilience Option 2 is currently only available at bandwidths of 1Gbps, | ||||||||
9) If a Communications Provider requires a non resilient circuit to be regraded to Resilience Option 2 that requires routing re-work, then a cease and re-provide has to be requested. | ||||||||
10) For Migrations from BES to EBD only or
from BES to EBD with BTL, please refer to the Contract for Connectivity
Services Schedule 5 – Migration, that can be found at: |
||||||||
http://www.openreach.co.uk/orpg/products/connectivityservices/connectivityservices.do | ||||||||
Price List | ![]() |
|||||||
Section : | Connectivity Services | |||||||
Product : | Bulk Transport Link | |||||||
Page : | ||||||||
Reference : | 3.2.2 | |||||||
Bulk Transport Link for 1Gbps | ||||||||
Openrach Handover Point (OHP) Hub | ||||||||
Operative from | Until | 1 yr Minimum Period Option | 3 yr Minimum Period Option | 5 yr Minimum Period Option | ||||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | ||||||
Module 1 | Connection | 22/05/2008 | £165,242 | £129,833 | £106,921 | |||
Rental per Annum | 22/05/2008 | £24,467 | £24,467 | £24,467 | ||||
Module 2,3,4 | Connection | 22/05/2008 | £64,204 | £50,446 | £41,544 | |||
Rental per Annum | 22/05/2008 | £1,532 | £1,532 | £1,532 | ||||
Migration from BES to BTL Hub Module 1 (note 9) | Migration | 01/07/2008 | n/a | n/a | £53,460.50 | |||
Rental per Annum | 22/05/2008 | n/a | n/a | £24,467 | ||||
Migration from BES to BTL Hub Module 2,3,4 (note 9) | Migration | 01/07/2008 | n/a | n/a | £20,772 | |||
Rental per Annum | 22/05/2008 | n/a | n/a | £1,532 | ||||
Main Link | ||||||||
Operative from | Until | 1 yr Minimum Period Option | 3 yr Minimum Period Option | 5 yr Minimum Period Option | ||||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | ||||||
Connection | 22/05/2008 | £43,627 | £34,279 | £28,229 | ||||
Rental per Annum | 22/05/2008 | £1,500 | £1,500 | £1,500 | ||||
Migration Charge from BES to BTL Main Link (note 9) | 01/07/2008 | n/a | n/a | £14,114.50 | ||||
Rental per Annum | 22/05/2008 | n/a | n/a | £1,500 | ||||
Main Link Radial Distance Charges | ||||||||
Operative Date | Until | 1 yr Minimum Period Option | 3 yr Minimum Period Option | 5 yr Minimum Period Option | ||||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | ||||||
1st Main Link Rental per annum per metre or part thereof (>0m up to 35,000 metres ) | 22/05/2008 | £1.24 | £1.24 | £1.24 | ||||
Subsequent Main Link Rental per annum per metre or part thereof (>0m up to 35,000 metres ) | 22/05/2008 | £0.62 | £0.62 | £0.62 | ||||
Point of Presence (PoP) | ||||||||
Operative from | Until | 1 yr Minimum Period Option | 3 yr Minimum Period Option | 5 yr Minimum Period Option | ||||
(£) Ex VAT | (£) Ex VAT | (£) Ex VAT | ||||||
Module 1 | Connection | 22/05/2008 | £27,699 | £21,763 | £17,923 | |||
Rental per Annum | 22/05/2008 | £2,429 | £2,429 | £2,429 | ||||
Module 2,3,4 | Connection | 22/05/2008 | £6,646 | £5,222 | £4,300 | |||
Rental per Annum | 22/05/2008 | £975 | £975 | £975 | ||||
Migration from BES to BTL PoP Module 1 (note 9) | Migration | 01/07/2008 | n/a | n/a | £8,961.50 | |||
Rental per Annum | 22/05/2008 | n/a | n/a | £2,429 | ||||
Migration from BES to BTL PoP Module 2,3,4 (note 9) | Migration | 01/07/2008 | n/a | n/a | £2,150 | |||
Rental per Annum | 22/05/2008 | n/a | n/a | £975 | ||||
5) All services include the care level set out in the Service Level Agreement within tariff. | ||||||||
6) For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list that can be found at: | ||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||
7) Excess Construction Charges will be raised in addition to normal Connection charges where additional infrastructure is provided to give new or extended service at a Communications Provider's Site or other requested location where BT would otherwise not choose to extend its network on the basis of normal commercial criteria. Excess charges apply to situations including provision to a new location within the Communications Provider's Site but does not apply to situations where existing capacity needs to be increased. There is no ‘within tariff’ allowance - the full value of any applicable charge is payable. Excess Construction Charges are detailed in the Service Products section of the price list that can be found at: | ||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | ||||||||
8) Resilience "Hot Standby" is currently supplied with the Bulk Transport Link, within tariff | ||||||||
9) Please refer to the Contract for Connectivity Services Schedule 5 – Migration, that can be found at: | ||||||||
http://www.openreach.co.uk/orpg/products/connectivityservices/connectivityservices.do | ||||||||
British Telecommunications plc | ||||||||
Registered office: | ||||||||
81 Newgate Street | ||||||||
London EC1A 7AJ | ||||||||
Registered in England and Wales No. 1800000 | ||||||||
Date: 20 May 2008 | www.openreach.co.uk |