Openreach ACCN :          OR 075
 
   
New      
Effective Date 30-Jun-08    
Notification Date 01-Apr-08      
OPENREACH ACCESS CHARGE CHANGE NOTICE
ACCN NUMBER: OR 075
PRODUCT: Sub Loop Unbundling
EFFECTIVE DATE: 30-Jun-08
SUBMITTED TO OFCOM ON:   01-Apr-08
 Price List
 
   
 Section : Local Loop Unbundling  
 Product : Sub Loop Unbundling  
 Page :    
 Reference : 2.4      
Forecasts and Surveys
 
  Operative Date Until Charge
£ Exc VAT
Data Report per MDF site  - (Note 1)  01/03/2008   101.04
Full survey 01/03/2008   350.00
Full Survey non-attendance  01/03/2008   85.00
Survey Cancellation (prior to meeting, post meeting full price applies) – (Note 2) 01/03/2008   75.00
 
Provision and Rental Charges 
 
  Operative Date Until Charge
£ Exc VAT
Sub Loop Connection charge – (MPF Transfer) 30/06/2005 29/06/2008 99.09
30/06/2008   127.61
Sub Loop MPF Connection charge – New Provide – Standard (Note 4) 30/06/2005 29/06/2008 151.97
30/06/2008   106.62
Sub Loop - Shared MPF Connection 30/06/2005 29/06/2008 99.09
30/06/2008   127.61
Sub Loop MPF Rental per annum 30/06/2005   93.96
Sub Loop Shared MPF Rental per annum 30/06/2005   11.47
Sub Loop – MPF New Line Minor Network Intervention  30/06/2005 29/06/2008 299.35
30/06/2008 Withdrawn
Sub Loop – MPF New Line Major Network Intervention  30/06/2005 29/06/2008 626.95
30/06/2008 Withdrawn
Sub Loop – MPF New Line Small Network Build  30/06/2005 29/06/2008 2759.86
30/06/2008 Withdrawn
Sub Loop Hand-back charge – Transfer 31/12/2000 29/06/2008 29.00
30/06/2008 Withdrawn
Test, Cease, Amend, Cancel and Rejection Charges
Sub Loop Cease charge 31/12/2000 29/06/2008 29.00
30/06/2008   100.67
PCP Extension Upgrade (Note 3) 01/03/2008   1829.11
Shared MPF/MPF Enhanced Care per annum 30/06/2008   37.54
Shared MPF/MPF Re-termination tie pair – next available Field Appt 30/06/2008   100.67
Shared MPF /MPF Order rejected at initial validation  30/06/2008   7.14
Shared MPF/MPF Order rejected at detailed evaluation 30/06/2008   14.28
Cancellation of Shared MPF/MPF Order  30/06/2008   7.14
Allowable change to Shared MPF/MPF Order   30/06/2008   7.14
Sub loop standard line test - RWT 30/06/2005 29/06/2008 99.09
From 30/06/08 this will be charged for via Time Related charges (See Note5) 30/06/2008    
Sub loop resistance test 30/06/2005 29/06/2008 99.09
30/06/2008 Withdrawn
Sub loop insertion loss 30/06/2005 29/06/2008 99.09
30/06/2008 Withdrawn
LLU Sub Loop Tie Cables
 
Sub Loop Access Tie Cables (100 metre of length only) Operative Date Until Charge
£ Exc VAT
Sub Loop Access Tie Cable Connection 20 pair (Note 6) 01/03/2008   725.60
Sub Loop Access Tie Cable Connection 50 pair (Note 6) 01/03/2008   725.60
Sub Loop Access Tie Cable Connection 100 pair (Note 6) 01/03/2008   765.32
Sub Loop Access Tie Cable Rental per annum 20 pair (Note 6) 01/03/2008   27.23
Sub Loop Access Tie Cable Rental per annum 50 pair (Note 6) 01/03/2008   32.68
Sub Loop Access Tie Cable Rental per annum 100 pair (Note 6) 01/03/2008   42.14
 
LLU Sub Loop Tie Cable – early cancellation fee
An early cancellation fee applies to all SLU Access Tie Cables. The table below explains the relevant fee payable to Openreach for the year in which the SLU Access Tie Cable is cancelled.
 
Year 1st 2nd 3rd 4th 5th 6th 7th
Fee (£) 7 x annual 6.5 x annual 6 x annual 5.5 x annual 5 x annual 4.5 x annual 4 x annual
rental rental rental rental rental rental rental
 
Year 8th 9th 10th 11th 12th 13th 14th
Fee (£) 3.5 x annual 3 x annual 2.5 x annual 2 x annual 1.5 x annual 1 x annual 0.5 x annual
rental rental rental rental rental rental rental
 
NOTES:
1) Data reports will be charged on a per MDF site basis.
2) Orders placed and cancelled before completing a Full Survey will incurr a cancellation charge, on completion of a Full Survey the survey charge will always apply. 
3) Charges for Sub-Loop PCP Extension Works will apply whenever a Full Survey identifies existing space is exhausted. The price will cover the replacement of the cabinet fabric only. Additional work, if required to facilitate the fabric change or to enable the installation of Sub Loop tie cables will be charged on a bespoke basis.
4) Additional charges may be raised where non standard work is required:. 
For work done by Openreach engineers not included in standard prices see `Time Related Charges' in the Common Portfolio Products section of the price list for details.
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
Where a Communication Provider has agreed an appointment with BT for work at the End Users' site in connection with the Communication Provider service, if BT is unable to carry out the work at, or gain access to, such End User site or the appointment is broken (unless due to BT's error). BT reserves the right to raise a Visit Charge as detailed in Common Portfolio Products Section of this Price List.
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
Charges for network infrastructure over and above standard requirements are charged as excess construction and can be found in `Excess Construction Charges' in the Common Portfolio Products section of this Price List at :
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
These charges include work on internal trunking & traywork; breaking through walls; additional poles, ducts and cables; radio charges and miscellaneous non-standard or specially requested items. 
                       
5) If a Communication Provider reports a fault and requests a field visit to complete further diagnostic tests over 
and above a standard line test (when available) and the fault diagnosis proves it to be the responsibility of the 
Communication Provider's (equipment), visit charges or TRC will be applied, which can be found under 
Service Products:-             
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do      
 
    British Telecommunications plc
    Registered office:
    81 Newgate Street
    London EC1A 7AJ
    Registered in England and Wales No. 1800000
Date:  1st April 2008   www.openreach.co.uk