Openreach ACCN : OR 093 |
|
|
|
|
|
|
|
|
|
New/Change |
|
|
|
|
|
|
|
|
|
|
Effective Date |
17-Sep-08 |
|
|
|
|
|
|
|
|
|
Notification Date |
09-Sep-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OPENREACH
ACCESS CHARGE CHANGE NOTICE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACCN NUMBER: |
|
OR 093 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PRODUCT: |
LLU -
Co-mingling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EFFECTIVE DATE: |
|
17-Sep-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUBMITTED TO OFCOM ON: |
17-Sep-08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price List |
|
|
|
|
|
|
|
|
|
Section : |
Local Loop Unbundling |
|
|
|
|
|
|
|
|
|
Product : |
Plan & Build |
|
|
|
|
|
|
|
|
|
Page : |
Accomodation |
|
|
|
|
|
|
|
|
|
Reference : |
2.1.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISTANT LOCATION (Notes 1 and 2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
|
|
£ Exc
VAT |
|
|
|
|
|
|
Distant location full
survey |
29/11/2001 |
|
911.24 |
|
|
|
|
|
|
Missed joint survey or testing appointment |
31/05/2001 |
|
17.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
PROVISION OF CO-LOCATION. (Notes 1 and 2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-mingling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
|
|
£ Exc
VAT |
|
|
|
|
|
|
Site visit charge to be allocated to all orders
not in conjunction with the installation of a base product. |
17/09/2008 |
|
275.00 |
|
|
|
|
|
|
Co-Mingling order rejection – no space or insufficient space
available |
25/01/2002 |
|
435.00 |
|
|
|
|
|
|
Forecast administration charge (note 26) |
17/11/2004 |
|
282.49 |
|
|
|
|
|
|
Co-Mingling set up fee (per sq metre) ( Notes 9, 11 and 16) |
01/08/2002 |
|
230.00 |
|
|
|
|
|
|
Comingling Shared Point of Presence Administration Fee |
12/05/2008 |
|
220.00 |
|
|
|
|
|
|
Ancillary Service Structure Fixed price to service 1-3 Rack
Space Units (Notes 12 and 16) |
01/10/2004 |
|
4620.20 |
|
|
|
|
|
|
Ancillary Service Structure Fixed price to service 4-6 Rack
Space Units (Notes 12 and 16) |
01/10/2004 |
|
5746.56 |
|
|
|
|
|
|
Ancillary Service Structure Fixed price to service 7-9 Rack
Space Units (Notes 12 and 16) |
01/10/2004 |
|
7249.67 |
|
|
|
|
|
|
Low Capacity Unit
(LCU) (note 24) |
01/10/2004 |
08/12/2008 |
3739.43 |
|
|
|
|
|
|
09/12/2008 |
|
3305.51 |
|
|
|
|
|
|
Medium Capacity Unit 1 (MCU with 1 customer rack
space unit) (note 24) |
01/10/2004 |
08/12/2008 |
4174.34 |
|
|
|
|
|
|
09/12/2008 |
|
3824.99 |
|
|
|
|
|
|
Medium Capacity Unit 2 (MCU with 2 customer rack
space units) (note 24) |
01/10/2004 |
08/12/2008 |
4441.39 |
|
|
|
|
|
|
09/12/2008 |
|
4059.54 |
|
|
|
|
|
|
B-BUSS3 (Broadband Britain Umbilical Services
Structure with 3 customer rack space units) (note 24) |
01/10/2004 |
08/12/2008 |
4882.84 |
|
|
|
|
|
|
09/12/2008 |
|
6305.11 |
|
|
|
|
|
|
B-BUSS7 (Broadband Britain Umbilical Services
Structure with 7 customer rack space units)
(note 24) |
01/10/2004 |
08/12/2008 |
6218.09 |
|
|
|
|
|
|
09/12/2008 |
|
7465.04 |
|
|
|
|
|
|
AC Final Distribution Rental per 10kw increment per annum (Notes
4, 13 and 19 - Charges will appear in billed units
of decawatts (100W) |
01/07/2003 |
|
311.02 |
|
|
|
|
|
|
Cooling per kw (Note 13) |
25/01/2002 |
|
1382.12 |
|
|
|
|
|
|
Initial UBASE rack including 5400 pair capacity
Handover Distribution Frame or Cable Management Frame (Note 2). |
07/09/2007 |
08/12/2008 |
8500.00 |
|
|
|
|
|
|
09/12/2008 |
|
7948.78 |
|
|
|
|
|
|
Initial or Additional UBASE standard rack (no
Handover Distribution Frame or Cable Management Frame included) (Note 2). |
07/09/2007 |
08/12/2008 |
7400.00 |
|
|
|
|
|
|
09/12/2008 |
|
6121.08 |
|
|
|
|
|
|
Provision of first Rack Space Unit (RSU) provided
at time of initial order or when ordered at a subsequent date |
07/09/2007 |
|
322.00 |
|
|
|
|
|
|
Provision of each additional RSU |
07/09/2007 |
|
64.00 |
|
|
|
|
|
|
Upgrade of existing MCU1 product to MCU2 (note 27) |
30/10/2007 |
|
874.00 |
|
|
|
|
|
|
Upgrade of existing BBUSS3 Point Of Presence to
BBUSS7 (note 27) |
30/10/2007 |
|
1930.00 |
|
|
|
|
|
|
MCU Max Initial build (Note X) |
17/09/2008 |
|
4077.43 |
|
|
|
|
|
|
MCU Max upgrade to existing MCU1 / MCU2 (Note X) |
17/09/2008 |
|
2342.25 |
|
|
|
|
|
|
MCU Max Upgrade from MCU1 / MCU2 Out of Hours
Connection Fee - Note V |
17/09/2008 |
|
900.00 |
|
|
|
|
|
|
MCU Max Aux upgrade to existing MCU1 / MCU2 (Note
X) |
17/09/2008 |
|
5981.94 |
|
|
|
|
|
|
MCU Max Aux Upgrade from MCU1 / MCU2 Out of Hours
Connection Fee - Note V |
17/09/2008 |
|
1350.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Basic Single Rack (Note Y) |
17/09/2008 |
|
2944.45 |
|
|
|
|
|
|
Complete Single Rack (Note W) |
17/09/2008 |
|
3889.14 |
|
|
|
|
|
|
HDF Cabinet Doors per pair provided at Initial
Build |
17/09/2008 |
|
620.05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note V - Out
of Hours are specified as outside of 8am to 5pm Monday-Friday excluding Bank
Holidays. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note W - 1.5KW / 3KW DC Power, 750VA Inverter,
Additional rectifier and Sub-meter provided as standard with additional costs
as per price list |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note X - 4.5KW / 6KW DC Power, 750VA
Inverter, Additional rectifier and Sub-meter provided as standard with
additional additional costs as per price list. |
|
|
|
|
|
|
|
|
|
|
|
|
Note Y -
Sub-meter provided as standard with additional costs as per price list. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note Z - DC Power, 1500VA Inverter, Additional rectifier
and Sub-meter provided as standard with additional costs as per price list. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price List |
|
|
|
|
|
|
|
|
|
Section : |
Local Loop Unbundling |
|
|
|
|
|
|
|
|
|
Product : |
Plan & Build |
|
|
|
|
|
|
|
|
|
Page : |
Power |
|
|
|
|
|
|
|
|
|
Reference : |
2.1.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Power |
|
|
|
|
|
|
|
|
|
|
|
|
|
Electricity Supply |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
|
|
Exc
VAT |
|
|
|
|
|
|
Rental per kW per annum (Note 1, charges will appear in billed
units of decawatts (100W)) |
01/07/2003 |
|
11.69 |
|
|
|
|
|
|
Usage per kWh (Notes 3 and 4) |
09/02/2007 |
09/11/2008 |
8.20p |
|
|
|
|
|
|
10/11/2008 |
|
9.68p |
|
|
|
|
|
|
Provision of sub meter (Note 5) |
12/06/2003 |
08/12/2008 |
964.26 |
|
|
|
|
|
|
09/12/2008 |
|
793.27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
DC Power Options |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
|
|
£ Exc
VAT |
|
|
|
|
|
|
1kw DC power option for LCU,
rental per annum -Note 2 |
01/10/2004 |
|
468.80 |
|
|
|
|
|
|
1.5kw DC power option provided at
initial build - rental per annum (Note 2) |
01/10/2004 |
|
577.20 |
|
|
|
|
|
|
3kw DC power option provided at initial
build rental per annum -Note 2 |
01/10/2004 |
|
651.20 |
|
|
|
|
|
|
4kw DC power option provided at initial
build rental per annum -Note 2 |
01/10/2004 |
|
1579.20 |
|
|
|
|
|
|
8kw DC power option provided at initial
build rental
per annum -Note 2 |
01/10/2004 |
|
1812.00 |
|
|
|
|
|
|
4.5kw DC power option provided at initial build
rental per annum -Note 2 |
17/09/2008 |
|
675.41 |
|
|
|
|
|
|
6kw DC power option provided at initial build
rental per annum -Note 2 |
17/09/2008 |
|
709.26 |
|
|
|
|
|
|
7.5kw DC power option provided at initial build
rental per annum -Note 2 |
17/09/2008 |
|
750.13 |
|
|
|
|
|
|
9kw DC power option provided at initial build
rental per annum -Note 2 |
17/09/2008 |
|
791.00 |
|
|
|
|
|
|
Additional rectifier provided at initial build to provide n+1
capacity for LCU, MCU1 or MCU2 products
or per 1.5kw capacity incremental step for the UBASE product -Note 2 |
01/10/2004 |
|
74.00 |
|
|
|
|
|
|
Additional rectifier provided at initial build to provide n+1
capacity for B-BUSS3 or B-BUSS7 products -Note 2 |
01/10/2004 |
|
116.40 |
|
|
|
|
|
|
500W UPS provided at initial build for LCU MCU1 or MCU2 -Note 2 |
01/10/2004 |
|
186.00 |
|
|
|
|
|
|
1050W UPS provided at initial build for B-BUSS£ or B-BUSS7 -Note
2 |
01/10/2004 |
|
249.20 |
|
|
|
|
|
|
700VA AC Inverter provided at initial build -Note
2 |
17/09/2008 |
|
468.94 |
|
|
|
|
|
|
1500VA AC Inverter provided at initial build -Note
2 |
17/09/2008 |
|
670.80 |
|
|
|
|
|
|
Additional battery string provided at initial build to provide 1
hour reserve at 4kw load for B-BUSS3 product only -Note 2 |
01/10/2004 |
|
248.00 |
|
|
|
|
|
|
Additional battery string provided at initial build to provide 1
hour reserve at 8kw load for B-BUSS7 product only -Note 2 |
01/10/2004 |
|
496.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Provision of Standby Epower (“ESS”) (Note1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operative Date |
Until |
Charge |
|
|
|
|
|
|
£ Exc
VAT |
|
|
|
|
|
|
Survey for capacity upgrade |
31/05/2001 |
|
325.28 |
|
|
|
|
|
|
Capacity upgrade |
31/05/2001 |
|
Bespoke |
|
|
|
|
|
|
Rental of existing capacity per kW per annum (Note 2, charges
will appear in billed units of decawatts (100W)) |
01/07/2003 |
|
145.28 |
|
|
|
|
|
|
Provision of sub meter -Note 5 |
12/06/2003 |
08/12/2008 |
964.26 |
|
|
|
|
|
|
09/12/2008 |
|
793.27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
British
Telecommunications plc |
|
|
|
|
|
|
|
|
Registered office: |
|
|
|
|
|
|
|
|
81 Newgate Street |
|
|
|
|
|
|
|
|
London EC1A 7AJ |
|
|
|
|
|
|
|
|
Registered in England
and Wales No. 1800000 |
|
|
|
|
|
|
Date: 09 Sept 2008 |
|
www.openreach.co.uk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|