Openreach ACCN :          OR 093
 
   
New/Change    
Effective Date 17-Sep-08  
Notification Date 09-Sep-08      
OPENREACH ACCESS CHARGE CHANGE NOTICE
ACCN NUMBER: OR 093
PRODUCT: LLU - Co-mingling
EFFECTIVE DATE: 17-Sep-08
SUBMITTED TO OFCOM ON:   17-Sep-08
 Price List
 
   
 Section : Local Loop Unbundling  
 Product : Plan & Build  
 Page : Accomodation  
 Reference : 2.1.1      
DISTANT LOCATION (Notes 1 and 2)
  Operative Date Until Charge
£ Exc VAT
Distant location full survey  29/11/2001   911.24
Missed joint survey or testing appointment 31/05/2001   17.00
PROVISION OF CO-LOCATION. (Notes 1 and 2)
Co-mingling
  Operative Date Until Charge
£ Exc VAT
Site visit charge to be allocated to all orders not in conjunction with the installation of a base product. 17/09/2008   275.00
Co-Mingling order rejection – no space or insufficient space available 25/01/2002   435.00
Forecast administration charge (note 26) 17/11/2004   282.49
Co-Mingling set up fee (per sq metre) ( Notes 9, 11 and 16) 01/08/2002   230.00
Comingling Shared Point of Presence Administration Fee 12/05/2008   220.00
Ancillary Service Structure Fixed price to service 1-3 Rack Space Units (Notes 12 and 16) 01/10/2004   4620.20
Ancillary Service Structure Fixed price to service 4-6 Rack Space Units (Notes 12 and 16) 01/10/2004   5746.56
Ancillary Service Structure Fixed price to service 7-9 Rack Space Units (Notes 12 and 16) 01/10/2004   7249.67
Low Capacity Unit  (LCU)  (note 24) 01/10/2004 08/12/2008 3739.43
09/12/2008   3305.51
Medium Capacity Unit 1 (MCU with 1 customer rack space unit)  (note 24) 01/10/2004 08/12/2008 4174.34
09/12/2008   3824.99
Medium Capacity Unit 2 (MCU with 2 customer rack space units) (note 24) 01/10/2004 08/12/2008 4441.39
09/12/2008   4059.54
B-BUSS3 (Broadband Britain Umbilical Services Structure with 3 customer rack space units) (note 24) 01/10/2004 08/12/2008 4882.84
09/12/2008   6305.11
B-BUSS7 (Broadband Britain Umbilical Services Structure with 7 customer rack space units)    (note 24) 01/10/2004 08/12/2008 6218.09
09/12/2008   7465.04
AC Final Distribution Rental per 10kw increment per annum (Notes 4, 13 and 19 - Charges will appear in billed units of decawatts (100W) 01/07/2003   311.02
Cooling per kw (Note 13) 25/01/2002   1382.12
Initial UBASE rack including 5400 pair capacity Handover Distribution Frame or Cable Management Frame (Note 2). 07/09/2007 08/12/2008 8500.00
09/12/2008   7948.78
Initial or Additional UBASE standard rack (no Handover Distribution Frame or Cable Management Frame included) (Note 2). 07/09/2007 08/12/2008 7400.00
09/12/2008   6121.08
Provision of first Rack Space Unit (RSU) provided at time of initial order or when ordered at a subsequent date 07/09/2007   322.00
Provision of each additional RSU 07/09/2007   64.00
Upgrade of existing MCU1 product to MCU2 (note 27) 30/10/2007   874.00
Upgrade of existing BBUSS3 Point Of Presence to BBUSS7 (note 27) 30/10/2007   1930.00
MCU Max Initial build (Note X) 17/09/2008   4077.43
MCU Max upgrade to existing MCU1 / MCU2 (Note X) 17/09/2008   2342.25
MCU Max Upgrade from MCU1 / MCU2 Out of Hours Connection Fee - Note V 17/09/2008   900.00
MCU Max Aux upgrade to existing MCU1 / MCU2 (Note X) 17/09/2008   5981.94
MCU Max Aux Upgrade from MCU1 / MCU2 Out of Hours Connection Fee - Note V 17/09/2008   1350.00
Basic Single Rack (Note Y) 17/09/2008   2944.45
Complete Single Rack (Note W) 17/09/2008   3889.14
HDF Cabinet Doors per pair provided at Initial Build 17/09/2008   620.05
Note V - Out of Hours are specified as outside of 8am to 5pm Monday-Friday excluding Bank Holidays.
Note W - 1.5KW / 3KW DC Power, 750VA Inverter, Additional rectifier and Sub-meter provided as standard with additional costs as per price list
Note X - 4.5KW / 6KW DC Power, 750VA Inverter, Additional rectifier and Sub-meter provided as standard with additional additional costs as per price list.
Note Y - Sub-meter provided as standard with additional costs as per price list.
Note Z - DC Power, 1500VA Inverter, Additional rectifier and Sub-meter provided as standard with additional costs as per price list.
 Price List
 
   
 Section : Local Loop Unbundling  
 Product : Plan & Build  
 Page : Power  
 Reference : 2.1.2      
Power
Electricity Supply
  Operative Date Until Charge
Exc VAT
Rental per kW per annum (Note 1, charges will appear in billed units of decawatts (100W)) 01/07/2003   11.69
Usage per kWh (Notes 3 and 4) 09/02/2007 09/11/2008 8.20p
10/11/2008   9.68p
Provision of sub meter (Note 5) 12/06/2003 08/12/2008 964.26
09/12/2008   793.27
DC Power Options
  Operative Date Until Charge
£ Exc VAT
1kw DC power option for LCU,  rental per annum -Note 2 01/10/2004   468.80
1.5kw DC power option provided at initial build - rental per annum (Note 2) 01/10/2004   577.20
3kw DC power option provided at initial build rental per annum -Note 2 01/10/2004   651.20
4kw DC power option provided at initial build rental per annum -Note 2 01/10/2004   1579.20
8kw DC power option provided at initial build rental per annum -Note 2 01/10/2004   1812.00
4.5kw DC power option provided at initial build rental per annum -Note 2 17/09/2008   675.41
6kw DC power option provided at initial build rental per annum -Note 2 17/09/2008   709.26
7.5kw DC power option provided at initial build rental per annum -Note 2 17/09/2008   750.13
9kw DC power option provided at initial build rental per annum -Note 2 17/09/2008   791.00
Additional rectifier provided at initial build to provide n+1 capacity for LCU, MCU1 or MCU2 products  or per 1.5kw capacity incremental step for the UBASE product -Note 2 01/10/2004   74.00
Additional rectifier provided at initial build to provide n+1 capacity for B-BUSS3 or B-BUSS7 products -Note 2 01/10/2004   116.40
500W UPS provided at initial build for LCU MCU1 or MCU2 -Note 2 01/10/2004   186.00
1050W UPS provided at initial build for B-BUSS£ or B-BUSS7 -Note 2 01/10/2004   249.20
700VA AC Inverter provided at initial build -Note 2 17/09/2008   468.94
1500VA AC Inverter provided at initial build -Note 2 17/09/2008   670.80
Additional battery string provided at initial build to provide 1 hour reserve at 4kw load for B-BUSS3 product only -Note 2 01/10/2004   248.00
Additional battery string provided at initial build to provide 1 hour reserve at 8kw load for B-BUSS7 product only -Note 2 01/10/2004   496.00
Provision of Standby Epower (“ESS”) (Note1)
  Operative Date Until Charge
£ Exc VAT
Survey for capacity upgrade 31/05/2001   325.28
Capacity upgrade 31/05/2001   Bespoke
Rental of existing capacity per kW per annum (Note 2, charges will appear in billed units of decawatts (100W)) 01/07/2003   145.28
Provision of sub meter -Note 5 12/06/2003 08/12/2008 964.26
09/12/2008   793.27
    British Telecommunications plc
    Registered office:
    81 Newgate Street
    London EC1A 7AJ
    Registered in England and Wales No. 1800000
Date: 09 Sept 2008    www.openreach.co.uk