Openreach ACCN :          OR 083
 
     
Change      
Effective Date 31-Aug-08    
Notification Date 02-Jun-08        
OPENREACH ACCESS CHARGE CHANGE NOTICE
ACCN NUMBER: OR 083
PRODUCT: LLU - MPF and SMPF Changes and Withdrawals
Ethernet - LLU Backhaul Private Circuits Product Withdrawal
EFFECTIVE DATE: 31-Aug-08
SUBMITTED TO OFCOM ON:   02-Jun-08
 Price List
 
     
 Section : Local Loop Unbundling    
 Product : Metal Path Facility    
 Page :      
 Reference : 2.2        
Provision and Rental Charges 
For Additional Charges of Non - Standard Work (See Note 16)
For details of MPF products and features refer to the MPF/SMPF Product Manual and End to End Process Manual available on the LLU web site. 
  Operative Date Until Charge
£ Exc VAT
MPF Connection charge – New Provide – Standard (note 16 and note 17) 15/12/2005   99.95
MPF line characteristics check on tactical platform (ECO) provision 17/01/2002 30/08/2008 2.60
31/08/2008 Withdrawn
Assurance Charges
For details of MPF Assurance procedures please refer to the LLU Service Assurance Manual available on the LLU web site.
  Operative Date Until Charge
£ Exc VAT
Level 1 Category Check 01/04/2002 30/08/2008 103.00
31/08/2008 Withdrawn
Level 2 Category Check 01/04/2002 30/08/2008 94.00
31/08/2008 Withdrawn
17) Multiple MPF new provisions enhanced capability. This is included within the provision process as described in the product documentation from the 30th June 2008.
 Price List
 
     
 Section : Local Loop Unbundling    
 Product : Shared Metal Path Facility    
 Page :      
 Reference : 2.3        
Provision and Rental Charges 
For Additional Charges of Non - Standard Work (See Note 15)
For details of SMPF products and features refer to the MPF/SMPF Product Manual and End to End Process Manual available on the LLU web site.
  Operative Date Until Charge
£ Exc VAT
Shared MPF line characteristics provision 17/01/2002 30/08/2008 £2.60
31/08/2008 Withdrawn
 Price List
 
     
 Section : Ethernet    
 Product : Backhaul Private Circuits    
 Page :      
 Reference : 3.13        
PRODUCT PAGE AND CONTENTS WITHDRAWN WITH AN EFFECTIVE OPERATIVE DATE  31st August 2008.
For terms and conditions applicable to these charges payable to BT see the Standard LLU Backhaul Agreement.
LLU Backhaul Private Circuit Handover
LLU Backhaul Private Circuit Configuration SMA-16
  Operative date Until Connection (fixed) (£ Ex VAT) Annual Rental  (Note 7) (£ Ex VAT)
SMA-16 ADM with no trib interfaces (single fibre working) - existing site 11.01.2006 30/08/2008 183,719.00 2,499.00
SMA-16 ADM with no trib interfaces (dual fibre working 1300nm) - existing site 11.01.2006 30/08/2008 187,852.00 2,423.00
SMA-16 ADM with no trib interfaces (dual fibre working 1550nm) - existing site 11.01.2006 30/08/2008 198,454.00 2,575.00
Additional charge for new site (Note 1) 11.01.2006 30/08/2008 8,665.00 0.00
Standby batteries if required 11.01.2006 30/08/2008 973.00 14.00
STM-1 electrical trib interface (2 ports) 11.01.2006 30/08/2008 5,935.00 85.00
STM-1 optical (1300nm) trib interface (1 port) 11.01.2006 30/08/2008 8,117.00 116.00
STM-1 electrical trib card (2 ports), required for 1+1 card protection  11.01.2006 30/08/2008 2,967.00 43.00
STM-1 optical (1300nm) trib card (1 port), required for MSP protection 11.01.2006 30/08/2008 2,182.00 31.00
STM-4 optical (1300nm) trib interface (1 port) 11.01.2006 30/08/2008 18,653.00 267.00
STM-4 optical (1300nm) trib card (1 port), required for MSP protection 11.01.2006 30/08/2008 6,784.00 97.00
LLU Backhaul Private Circuit Configuration SMA-4
  Operative date Until Connection (fixed) (£ Ex VAT) Annual Rental  (Note 7) (£ Ex VAT)
SMA-4 ADM with no trib interfaces (single fibre working) – existing site 11.01.2006 30/08/2008 116,030.00 1,528.00
SMA-4 ADM with no trib interfaces (dual fibre working 1300nm) – existing site 11.01.2006 30/08/2008 116,933.00 1,406.00
SMA-4 ADM with no trib interfaces (dual fibre working 1550nm) – existing site 11.01.2006 30/08/2008 133,994.00 1,651.00
Additional charge for new site (Note 1) 11.01.2006 30/08/2008 8,665.00 0.00
Standby batteries if required 11.01.2006 30/08/2008 973.00 14.00
STM-1 electrical trib interface (1 ports) 11.01.2006 30/08/2008 1,527.00 22.00
STM-1 optical (1300nm) trib interface (1 port) 11.01.2006 30/08/2008 4,746.00 68.00
STM-1 electrical trib card (1 ports), required for 1+1 card protection  11.01.2006 30/08/2008 1,282.00 18.00
STM-1 optical (1300nm) trib card (1 port), required for MSP protection  11.01.2006 30/08/2008 2,182.00 31.00
STM-4 optical (1300nm) trib interface (1 port) 11.01.2006 30/08/2008 17,040.00 244.00
STM-4 optical (1300nm) trib card (1 port), required for MSP protection 11.01.2006 30/08/2008 6,784.00 97.00
LLU Backhaul Private Circuit Configuration MSH51
  Operative date Until Connection (fixed) (£ Ex VAT) Annual Rental  (Note 7) (£ Ex VAT)
MSH51 ADM with no trib interfaces (single fibre working) - existing site 11.01.2006 30/08/2008 104,873.00 1,368.00
MSH51 ADM with no trib interfaces (dual fibre working 1300nm) - existing site 11.01.2006 30/08/2008 113,016.00 1,350.00
MSH51 ADM with no trib interfaces (dual fibre working 1550nm) - existing site 11.01.2006 30/08/2008 115,598.00 1,387.00
Additional charge for new site (Note 1) 11.01.2006 30/08/2008 8,665.00 0.00
Per km from serving exchange to MSH node - single fibre working 11.01.2006 30/08/2008 6,146.00 2.00
Per km from serving exchange to MSH node - dual fibre workings 11.01.2006 30/08/2008 12,291.00 4.00
Standby batteries if required 11.01.2006 30/08/2008 973.00 14.00
STM-1 electrical trib interface (4 ports) 11.01.2006 30/08/2008 6,421.00 92.00
STM-1 optical (1300nm) trib interface (2 ports 11.01.2006 30/08/2008 7,142.00 102.00
STM-1 electrical trib card (4 ports), required for 1+1 card protection  11.01.2006 30/08/2008 2,140.00 31.00
STM-1 optical (1300nm) trib card (2 ports), required for MSP protection 11.01.2006 30/08/2008 2,861.00 41.00
STM-4 optical (1300nm) trib interface (1 port) 11.01.2006 30/08/2008 6,573.00 94.00
STM-4 optical (1300nm) Trib card (1 port), required for MSP protection 11.01.2006 30/08/2008 2,292.00 33.00
Spread connection charge options (Note 2)
  Operative date Until Annual payment as percentage of connection charge
Spread over two years 11.01.2006 30/08/2008 59.12%
Spread over four years 11.01.2006 30/08/2008 36.29%
Connection of a New Circuit – per circuit
  Operative date Until Single charge (£ Ex VAT)
2 Mbit/s 11.01.2006 30/08/2008 1,562.00
34 Mbit/s – 45 Mbit/s 11.01.2006 30/08/2008 1,640.00
140 Mbit/s and above 11.01.2006 30/08/2008 1,718.00
Co-Location Site Infrastructure
  Operative date Until Single charge (£ Ex VAT)
2Mbit/s circuit delivered by  HDSL on existing copper 11.01.2006 30/08/2008 3,937.00
2Mbit/s circuit delivered by  HDSL on new copper (note 11) 11.01.2006 30/08/2008 4,801.00
Provide a 2Mbit  4x2 at new fibre site 11.01.2006 30/08/2008 9,816.00
Provide a 2Mbit  4x2 at existing fibre site 11.01.2006 30/08/2008 4,457.00
Provide a 2Mbit 16x2 at new fibre site 11.01.2006 30/08/2008 15,296.00
Provide a 2Mbit 16x2 at existing fibre site 11.01.2006 30/08/2008 9,937.00
Subsequent 2Mbit/s circuit on existing LLU Backhaul 4x2 or 16x2 (provided after 1/8/01) 11.01.2006 30/08/2008 No infrastructure charge
LLU co-location sited SMA-1 ADM
  Operative date Until Single charge (£ Ex VAT)
SMA-1 ADM with no trib interfaces (single fibre working) – new site 11.01.2006 30/08/2008 38,377.00
SMA-1 ADM with no trib interfaces (single fibre working) – new site 11.01.2006 30/08/2008 33,018.00
Standby batteries if required 11.01.2006 30/08/2008 973.00
2Mbit/s trib card (16 ports)  11.01.2006 30/08/2008 3,915.00
34Mbit/s trib card (3 ports) 11.01.2006 30/08/2008 2,077.00
45Mbit/s trib card (3 ports) 11.01.2006 30/08/2008 2,077.00
STM-1 electrical trib card (1 port) 11.01.2006 30/08/2008 1,282.00
STM-1 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 2,182.00
140Mbit/s electrical trib card (1 port) 11.01.2006 30/08/2008 1,967.00
LLU co-location sited SMA-4 ADM
  Operative date Until Single charge (£ Ex VAT)
SMA-4 ADM with no trib interfaces (single fibre working) – new site 11.01.2006 30/08/2008 104,276.00
SMA-4 ADM with no trib interfaces (single fibre working) – existing site 11.01.2006 30/08/2008 98,917.00
Standby batteries if required 11.01.2006 30/08/2008 973.00
2Mbit/s trib cards (32 ports) 11.01.2006 30/08/2008 7,003.00
34Mbit/s trib card (3 ports) 11.01.2006 30/08/2008 2,077.00
45Mbit/s trib card (3 ports)  11.01.2006 30/08/2008 2,077.00
STM-1 electrical trib card (1 port) 11.01.2006 30/08/2008 1,282.00
STM-1 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 2,182.00
140Mbit/s electrical trib card (1 port) 11.01.2006 30/08/2008 1,967.00
STM-4 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 6,784.00
LLU co-location sited SMA-16 ADM
  Operative date Until Single charge (£ Ex VAT)
SMA-16 with no trib interfaces (single fibre working) – new site 11.01.2006 30/08/2008 171,224.00
SMA-16 with no trib interfaces (single fibre working) – existing site 11.01.2006 30/08/2008 165,865.00
Standby batteries if required 11.01.2006 30/08/2008 973.00
2Mbit/s trib cards (32 ports) 11.01.2006 30/08/2008 7,003.00
34Mbit/s trib card (3 ports)  11.01.2006 30/08/2008 2,077.00
45Mbit/s trib card (3 ports) 11.01.2006 30/08/2008 2,077.00
STM-1 electrical trib card (2 ports) 11.01.2006 30/08/2008 165,865.00
STM-1 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 2,182.00
140Mbit/s electrical trib card (1 port) 11.01.2006 30/08/2008 1,967.00
STM-4 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 6,784.00
LLU co-location sited MSH-51C ADM
  Operative date Until Single charge (£ Ex VAT)
MSH51 with no trib interfaces (single fibre working) – new site 11.01.2006 30/08/2008 114,602.00
MSH51 with no trib interfaces (single fibre working) – existing site 11.01.2006 30/08/2008 109,243.00
MSH51 with no trib interfaces (dual fibre working 1300nm) – new site 11.01.2006 30/08/2008 112,088.00
MSH51 with no trib interfaces (dual fibre working 1300nm) – existing site 11.01.2006 30/08/2008 101,370.00
MSH51 with no trib interfaces (dual fibre working 1550nm) – new site  11.01.2006 30/08/2008 129,149.00
MSH51 with no trib interfaces (dual fibre working 1550nm) - existing site 11.01.2006 30/08/2008 118,431.00
Per km from serving exchange to MSH node - single fibre working 11.01.2006 30/08/2008 6,146.00
Per km from serving exchange to MSH node - dual fibre working 11.01.2006 30/08/2008 12,291.00
Standby batteries if required 11.01.2006 30/08/2008 973.00
STM-1 electrical trib card (4 ports) 11.01.2006 30/08/2008 2,140.00
STM-1 optical (1300nm) trib card (2 ports) 11.01.2006 30/08/2008 2,182.00
140Mbit/s electrical trib card (1 port) 11.01.2006 30/08/2008 2,140.00
STM-4 optical (1300nm) trib card (1 port) 11.01.2006 30/08/2008 6,784.00
Circuit Rental / Maintenance
Circuit rental per annum (Note 7) Regular Care Enhanced Care
Bandwidth Operative Date Until LLU Co-location site fixed (£ per annum) Main link fixed (£ per annum) Main link (£ per km p.a. up to break point) Charge break point (km) Charge beyond break point (£ per km p.a.) Fixed         (£ p.a) Per km (£p.a.)
2M 11.01.06 30/08/2008 533 779 59.7 15 107.34 328 2.98
34/45M 11.01.06 30/08/2008 3,771 3,828 628.59 15 583.68 1,900 31.43
140/155M 11.01.06 30/08/2008 10,577 14,659 2,200.23 15 1,236.57 6,309 110.01
 
Bandwidth
(Note 8)
Operative Date Until LLU Co-location site fixed charge per annum (£) Single fibre working (£) Dual fibre working (£) Rental charge per annum per network hop across MSH
(note 7)  (£)
622M 11.01.2006 30/08/2008 1,319 2 4 75,000
 
Other Charges
 
Time Related Charges
Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) are detailed in the Common Portfolio Products section of the price list, Section 4.2 that can be found at: 
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
 
Excess Construction Charges
Excess Construction Charges are detailed in the Common Portfolio Products section of the price list, Section 4.3 that can be found at
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
 
Shift of a circuit an LLU Co-Location site (2 Mbit/s only)
  Operative date Until Single charge (£ Ex VAT)
Shift charge per circuit - 2 Mbit/s 11.01.2006 30/08/2008 £1,562
 
Shift of a Circuit at LLU Backhaul Circuit point of handover ( Note 10)
  Operative date Until Mon - Sat (Note 9) Sundays  Single charge (£)
Shift charge per circuit - 2 Mbit/s 11.01.2006 28/08/2008 £91 £121 £152
 
Cancellation Charges - (Note 5)
 
Cancellation charges for Circuits Normally Provided in 10 Working Days
Working days before Contractual Completion Date % of Connection Charge
1 or less 90
2 > 3 75
4 > 5 60
6 > 8 30
9 or more 0
 
Cancellation Charges for Circuits Normally Provided in 30 Working Days or with CCD's agreed with the Communications Provider
Working days before Contractual Completion Date % of Connection Charge
2 or less 90
2 > 3 75
20 - 22 60
23 - 25 30
26 or more 0
 
Cancellation charges for LLU Backhaul Private Circuit handover and Co-Location Link Infrastructure provision
Working days before Contractual Delivery Date (Note 6) % of Connection Charge
2 or less 90
2 > 3 75
20 - 22 60
23 - 25 30
26 or more 0
Notes: 
1) To obtain the total New Site connection charge, this additional charge  must be added to the relevant 'Existing Site' connection charge. The price covers the installation of duct from the CP’s POH, to their nearest serving exchange. 
 
2) Available on charge for new SMA4, SMA16 or MSH51 POH only – payments due quarterly in advance in addition to rental. If a customer cancels during a period or defaults on the payment of the infrastructure spread connection charge, the outstanding balance shall become payable.
 
3) Where duct or external plant is provided for the sole use of a CP or a CP’s customer,  excess construction charges will apply if it is not envisaged that any other CP will make use of it within 12 months of completion of the first circuit on it.. There is no ‘within tariff’ allowance  - the full value of any applicable charge is payable. 
 
5) All days will be calculated as Working Days, i.e. ignoring weekends and public holidays. The cancellation date must be given in writing by the CP. Cancellation charges will be raised only if a signed contract has been received from the Operator. If BT fails to meet the contractual delivery date and the customer cancels the order, a charge will not be raised. The full cost of any additional work, e.g. duct, that is separately identified on the contract and which has been specifically incurred for the order by the time of the cancellation, will be recovered in addition to the cancellation charge. Should an Operator request amendments to the contractual delivery date  and subsequently cancel the order, the cancellation charge will be calculated on the days between the date that the Operator  notified BT of the first amendment and the original contractual delivery date.
 
6) Commencement of rental is as follows: for LLU Backhaul Private Circuit handover links the Ready for Service Date; for LLU Backhaul Co-location site links the Contractual Completion Date
 
7) Quarterly billing of this item is available.
 
8) The 622Mbit/s product includes the Enhanced Care maintenance option within tariff.
 
9) Charge  covers out-of-hours working.
 
10) This charge is only applicable where all infrastructure exists at the new terminating point and where the existing and receiving ADM are delivered over SDH equipment.
 
11) New Copper is where both a new BT termination point and new cable are to LLU co-location space are required. Excess Construction charges may apply.
 
    British Telecommunications plc
    Registered office:
    81 Newgate Street
    London EC1A 7AJ
    Registered in England and Wales No. 1800000
Date:  02 June 2008   www.openreach.co.uk